Equipment Features and Advantages:
- Simple process with minimal equipment: The system primarily uses 1 high-efficiency reactor, 2 high-efficiency cyclone clarifiers, 2 wastewater lifting pumps, and 2 sludge transfer pumps.
- Highly automated and easy to operate: The system can be started and stopped with a single button, minimizing operator intervention.
- Compact footprint and low civil construction costs: The entire system occupies less than 30 square meters, reducing infrastructure needs.
- Low operating cost: The system requires only one chemical, resulting in a treatment cost of 3-4 yuan per ton of water.
- Stable operation and excellent water quality: The system ensures consistent performance and effluent that meets regulatory discharge standards.
Product Specifications:
High-efficiency reactor: Diameter 2.5 meters x Height 3.0 meters, Net weight 5 tons
High-efficiency cyclone clarifier: Diameter 3.0 meters x Height 6.4 meters, Net weight 8 tons
Additional Information:
Total operating power: 17.37 kW
Productivity: 30 tons per hour
This case study demonstrates how the Jiahu Bay Desulfurization Wastewater Treatment Project successfully addressed critical challenges in an existing wastewater treatment system. The transformed system offers a simplified, cost-effective, and reliable solution for various industries.